Installation checklist

Step-by-step list installers use before handover.

Use a checklist per machine: pick the mounting point, clean the surface, fix the unit with screws to a maximum of 3 Nm, activate it with the magnet, then confirm in the console that the asset has reported within the agreed window.

Photograph the final installation position and serial label. This saves time if support needs to trace a mismatch between equipment records and hardware.